Complete renovations
Strip-out, waterproofing, tiling and bathroom fittings in one agreed scope.
HANDYMAN GAUTENG · BATHROOM RENOVATIONS
Handyman Gauteng renovates bathrooms across Gauteng, from replacing worn tiles and fittings to complete bathroom makeovers.
The service covers strip-out, waterproofing, wall and floor tiling, plumbing connections, baths, showers, toilets and vanities. A written quotation sets out the work before the renovation starts.
Send the suburb, room measurements and a few photographs on WhatsApp.
Prefer a contact form? Send an enquiry →
Strip-out, waterproofing, tiling and bathroom fittings in one agreed scope.
Costs depend on room size, finishes, plumbing changes and existing damage.
A standard renovation typically takes 7 to 14 working days. Confirm the schedule for the room.
Wet areas need preparation and waterproofing before the new tiles go on.
Choose tiles and fixtures, with supply responsibilities confirmed in the quote.
Johannesburg, Pretoria, Centurion, Midrand and the East Rand.
PLAN THE BUDGET
A bathroom renovation price depends on what needs replacing and what sits behind the existing tiles. Keeping the same layout can reduce plumbing work. Moving a toilet, building a new shower or repairing damaged surfaces adds to the scope.
Handyman Gauteng quotes for the actual room and chosen finishes. The table below explains the items to include in a bathroom renovation quote.
| Quotation item | What needs to be confirmed |
|---|---|
| Strip-out and removal | Old tiles, sanitaryware and fittings to remove, plus rubble handling. |
| Surface preparation | Wall repairs, floor levelling and the condition of the exposed surfaces. |
| Waterproofing | Wet areas included, the selected system and its application requirements. |
| Wall and floor tiling | Measured coverage, tile size, layout, adhesive, grout and trims. |
| Plumbing connections | Existing positions to retain, fittings to connect and any pipe alterations. |
| Bathroom fixtures | Bath, shower, toilet, basin, vanity, taps and accessories to supply or install. |
| Finishing and handover | Painting, sealing, cleaning and the final checks included in the work. |
Handyman Gauteng agrees on the renovation scope before work begins. A complete project can combine the following services; a smaller refresh may need only some of them.
Remove the selected tiles, fittings and sanitaryware. Inspect the exposed surfaces so cracks, loose plaster or damp damage can be addressed before new finishes cover them.
Prepare wet areas and apply a compatible system around the shower, floor junctions and penetrations before tiling. View waterproofing services.
Fit the chosen tiles with planned setting-out, aligned joints and suitable finishing details. View tiling services.
Coordinate the agreed connections for a bath, shower, basin and toilet. Confirm any pipe or waste-outlet changes in the quote. View plumbing services.
Fit storage, mirrors, towel rails and other agreed accessories. Check door openings and the space around the basin before choosing a vanity.
Complete the agreed painting, sealing and finishing work. Confirm the products' curing times before the bath or shower returns to normal use.
The condition of the bathroom matters more than its size alone. A compact bathroom with sound surfaces may need fewer changes than a larger room with leaks or a poor layout.
| Option | Typical scope | Main consideration |
|---|---|---|
| Bathroom refresh | Selected fittings, accessories and finishes. | Suitable where the layout and underlying surfaces can remain. |
| Small bathroom renovation | New tiles and sanitaryware, often within the existing layout. | Check usable floor space, storage and door clearances. |
| Complete bathroom renovation | Strip-out, preparation, waterproofing, tiling and new fittings. | Agree on the full scope and product choices before work starts. |
| Bathroom layout change | Repositioned fixtures and associated plumbing or building work. | Check drainage, access and any additional work before pricing. |
New tiles cannot solve every bathroom problem. Recurring damp, loose tiles or staining in an adjoining room need investigation before the surfaces are covered again. Handyman Gauteng checks the proposed work during the assessment and includes the agreed preparation in the scope.
A shower needs practical drainage and enough space for its enclosure and door. A basin or vanity must leave room to move, and storage should not block access to plumbing connections. Keeping these details in the plan reduces last-minute changes.
For flats and estates, confirm access arrangements, permitted working times and any building-management requirements before scheduling the renovation.
The work follows a clear sequence so preparation, plumbing and waterproofing happen before the final finishes.
Check the room, access, visible leaks, pipe positions and the intended layout. Record the fittings and finishes required.
Agree on the work, supply responsibilities, exclusions and programme before strip-out starts.
Remove the agreed fixtures and finishes. Inspect exposed surfaces and discuss any hidden damage before extra work proceeds.
Complete the agreed plumbing alterations and prepare wet areas. Apply the selected waterproofing system and allow the specified curing time.
Lay the wall and floor tiles, finish joints and fit the agreed bath, shower, toilet, basin, vanity and accessories.
Check the fittings, drainage and visible finishes. Confirm product curing periods and care instructions before normal use.
Handyman Gauteng serves homeowners across Johannesburg, Pretoria and the East Rand. Select an area for local service information, or send the suburb with the bathroom enquiry.
Send the suburb, photographs and the changes required.
View the business location on Google Maps. Confirm the project address and assessment arrangements when enquiring.
Open Handyman Gauteng on Google Maps →Handyman Gauteng prices each bathroom after checking the room, the existing plumbing and the required finishes. The quote should separate labour, materials, fixtures and any changes to the layout. Send photographs, approximate measurements and the suburb to request an assessment.
A standard bathroom renovation typically takes 7 to 14 working days. Extensive repairs, changes to the plumbing layout, material lead times and curing periods can extend the programme. Handyman Gauteng confirms a project-specific schedule before work begins.
Yes. A small bathroom can often keep its existing toilet, basin and bath or shower positions. New tiles, fittings, storage and lighting can improve the room without a full layout change. The existing pipework and drainage still need an inspection.
Yes. Tiles and grout are finishes rather than a complete waterproofing system. Shower floors, wall junctions and pipe penetrations need suitable preparation and a compatible waterproofing system before tiling. Application, curing and testing must follow the selected product instructions.
Yes. Customers can supply tiles and fixtures, or request supply as part of the quote. Confirm sizes, quantities and compatibility with Handyman Gauteng before purchase. The quote needs to state which items the customer supplies and which items the contractor supplies.
Handyman Gauteng coordinates the plumbing connections needed for the agreed bathroom renovation. The scope can include a basin, toilet, bath, shower and taps. Moving supply pipes or waste outlets changes the work required and must be included in the quotation.
The bathroom may be unavailable during strip-out, plumbing work, waterproofing and tiling. A second bathroom or another arrangement is useful during this period. Handyman Gauteng confirms when fixtures can return to use after the relevant products have cured.
Handyman Gauteng serves Johannesburg, Sandton, Randburg, Midrand, Pretoria, Centurion and East Rand areas including Edenvale, Germiston, Kempton Park, Benoni, Boksburg and Brakpan. Send the suburb and project details to confirm an assessment.
START WITH THE ROOM. BUILD THE PLAN.
Contact Handyman Gauteng with the suburb, bathroom photographs and the changes required.